ELECTRONIC SE www.doorway.ru , et ) la bouteille en service. Heure du jour Volume restant Bouteille n°1 en service Réglage de l’heure du jour Appuyer sur la touche ou pour ajuster l’heure du jour minute par minute. Appuyer et There are two options to initiate a manual regeneration: 1- Press and release the. Fleck " Twin Alternating Commercial Water Softener This /2” full-flow Fleck Valve with SXT controller and /2” meter is a heavy-duty system capable of continuous flow and is available in , to , Grain Capacities. FLECK AND PENTAIR MANUALS - EXCELLENT SOURCE OF INFORMATION. 1. Identifying your unit or water softener type. 2. Finding information about programing your equipment. 3. Ordering Parts. Therefore, we ask that you at least give us the opportunity to earn your business. Remember we beat all competitors prices BY UP TO 10%.
4 • FLECK Model ProFloSXT Downflow Service Manual INSTALLATION INSTRUCTIONS Water Pressure A minimum of 20 psi ( bar) of water pressure is required for regeneration valve to operate effectively. Electrical Facilities An uninterrupted alternating current (A/C) supply is required. Installer manual Fleck SXT - Generalities Ref. MKT-IM / D - 11 / Scan Service application Scan Service mobile application is the ideal support for the maintenance person in his daily business. A simple scan of an identification (ID) label (1) present on the valve with a smartphone. Installer manual Fleck SXT - Generalities Ref. MKT-IM / E - 7 / Intended use The device is intended for commercial applications use only and it is purpose-built for water treatment. Abbreviations used Assy Assembly BLFC Brine Line Flow Controller BV Brine Valve CW Cold Water DF Down Flow Distr Distribution.
Manual de operacion y partes Fleck ECONOMINDER MODELO Manual de Servicio. IMPORTANTE: Llene la informaci贸n de la p谩gina 2 para referencia futura. Model // 7 Cycle timer into backwash position. Turn manual knob so that the micro switch rides on the first set of pins. — In this position the tanks switch (lower piston) and the control valve moves to the backwash position (upper. 4 • FLECK® // Service Manual Rev D Figure 5 Program Wheel Cycle timer into backwash position. Turn manual knob so that the micro switch rides on the first set of pins. In this position the tanks switch (lower piston) and the control valve moves to the backwash position (upper piston). Wait.
0コメント