Thank-you for choosing an Electric Bike Company bike. Our number one focus is to make you aware of the dangers of riding a bicycle and especially an electric bicycle so you can ensure you have safe and enjoyable riding experiences for years to come. IMPORTANT: Please read this manual in its entirety before riding your bike or allowing anyoneMissing: key meter. * Use the meter only as specified in this manual; otherwise, the protection provided by the meter may be impaired. * Use extreme caution when working around bare conductors or bus bars. * Do not operate the meter around explosive gas, vapor, or dust. * Verify a Meter's operation by measuring a known voltage. ELECTRIC BICYCLE METER KT—LCD3 Product User Manual Button Definition KT-LCD3 meter adopts the structural form with part design between the main part and operating buttons. There are three keys on the operating panel of button box, which are icons of button (alt text UP), button (alt text SW) and (alt text DOWN).
Instruction Manual: MultiPump Electric AdBlue™ Pump for Drum: Manual: Oil Lifter: Datasheet: Instruction Manual: Instruction Manual: Datasheet: User Key Guides: System Requirements: Piusi MCO Oil Management System: K Pulse Meter Manual: Piusi K Fuel Pulse Meter: Technical Data: Datasheet: Piusi K44 Fuel Flow Meter. Hi. I've just moved into a new house which has a Talexus ace kbd pre pay electric meter which uses some form of "USB type" key for topping it up. Whilst most of the screens (A through to K) as a result of pushing the blue button are obvious I would appreciate it if someone could advise what they all mean and/or the location of a user guide. The FOCUS meter was designed to be a low-cost, solid-state, kWh-only meter as an alternative metering and AMR platform to the induction meter. The meter is based on reliable, field proven digital multiplication measurement technique. The meter platform will measure energy accurately over varying environmental conditions.
* Use the meter only as specified in this manual; otherwise, the protection provided by the meter may be impaired. * Use extreme caution when working around bare conductors or bus bars. * Do not operate the meter around explosive gas, vapor, or dust. * Verify a Meter's operation by measuring a known voltage. the National Electric Safety Code (NESC) or the National Electric Code (NEC). SECTION 2 ELECTRICAL SAFETY AND CODE. CLEARANCES. 2. It is the policy of HEC to operate the Electric Distribution System with the highest degree of care and safety for the public and employees. To ensure the care and safety needed for an Electric Distribution System. ELECTRIC BICYCLE METER KT—LCD3 Product User Manual Button Definition KT-LCD3 meter adopts the structural form with part design between the main part and operating buttons. There are three keys on the operating panel of button box, which are icons of button (alt text UP), button (alt text SW) and (alt text DOWN).
0コメント